Judge blocks another bid to shut down Line 3 construction

MINNEAPOLIS (AP) — A federal judge has rejected another attempt by opponents to shut down construction work on Enbridge Energy’s replacement for its aging Line 3 crude oil pipeline across northern Minnesota.

In an order filed Sunday, U.S. District Judge Colleen Kollar-Kotelly said tribal and environmental groups that filed for an injunction in late December to suspend construction failed to prove any permanent harm would result from allowing the work to proceed or that they’re likely to win on their broader legal arguments.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/02/ap-judge-blocks-shut-down-line-3-construction/

The Associated Press

Should future plans for Line 5 consider climate change?

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/02/future-plans-line-5-climate-change/

Michigan Radio

Michigan approves Great Lakes oil pipeline tunnel permits

TRAVERSE CITY, Mich. (AP) — Michigan’s environmental agency said Friday it has approved construction of an underground tunnel to house a replacement for a controversial oil pipeline in a channel linking two of the Great Lakes.

The decision, a victory for Enbridge Inc., comes as the Canadian company resists Democratic Gov.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/01/ap-michigan-approves-great-lakes-oil-pipeline-tunnel-permits/

Natasha Blakely

EGLE Permits: Michigan agency approves permits needed for Enbridge tunnel project

The Enbridge Line 5 tunnel in the Straits of Mackinac today got another step closer to being built.

The Michigan Department of Environment, Great Lakes, and Energy (EGLE) announced its approval of the permits that Enbridge is required to have to build the replacement tunnel under the Straits of Mackinac.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/01/egle-approves-permits-enbridge-line-5-tunnel/

Natasha Blakely

Enbridge rejects Michigan’s demand to shut down oil pipeline

TRAVERSE CITY, Mich. (AP) — Enbridge said Tuesday it would defy Michigan’s demand to shut down an oil pipeline that runs through a channel linking two of the Great Lakes, contending that Gov. Gretchen Whitmer’s decision was based on bad information and political posturing.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/01/ap-enbridge-rejects-michigan-demand-to-shut-down-oil-pipeline/

The Associated Press

“I can sum it up in one word, and that is: nightmare.” 10 years after massive oil spill in Michigan

By Rebecca Williams, Michigan Radio

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/10-years-after-oil-spill-kalamazoo-river-michigan/

Michigan Radio

With Line 5 closure, a ‘game of chicken’ over how to heat Upper Peninsula

By Kelly House, Bridge Michigan, through the Institute for Nonprofit News network

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/line-5-closure-upper-peninsula/

Bridge Michigan

Pipelines and Plastic Bottles: Michigan advocate focuses on Line 5 and Nestle bottled water issue

When Michigan Gov. Gretchen Whitmer took office in January 2019, she immediately put a spotlight on the Enbridge Line 5 oil pipeline and started the process that would eventually lead to her ordering it shut down.

In her 2018 campaign, Whitmer also pledged to remedy the inequities related to water withdrawal issues, specifically a Nestle Waters case being fought by grassroots advocates that originated in the administration of former Gov.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/pipelines-and-plastic-bottles-michigan-advocate-focuses-on-line-5-and-nestle-bottled-water-issue/

Gary Wilson

Federal officials hear arguments on Enbridge pipeline tunnel

TRAVERSE CITY, Mich. (AP) — Building an oil pipeline tunnel beneath a channel linking two of the Great Lakes would risk environmental devastation, opponents said Monday, while supporters argued that rejecting the plan would further damage a Michigan economy already reeling from the coronavirus.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-federal-officials-hear-arguments-enbridge-pipeline-tunnel/

The Associated Press

Minnesota regulators deny request to delay Line 3 pipeline

MINNEAPOLIS (AP) — A Minnesota regulatory panel on Friday denied a request from two tribes to prevent Enbridge Energy from moving forward with its contentious Line 3 crude oil pipeline replacement, which broke ground this week after receiving its final state permit.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-minnesota-regulators-deny-request-to-delay-line-3-pipeline/

The Associated Press

What’s next for the Enbridge Line 3 project in Minnesota? Construction. And protests.

By Walker Orenstein, MinnPost, through the Institute for Nonprofit News network

Enbridge Energy has all the permits it needs to start construction on a controversial new crude oil pipeline in Minnesota, more than five years after the Canadian company first asked state regulators to approve the Line 3 project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/enbridge-line-3-project-minnesota-construction-protests/

MinnPost

Enbridge starts construction on Line 3 in Minnesota

MINNEAPOLIS (AP) — Enbridge Energy began construction on its Line 3 crude oil pipeline replacement in Minnesota on Tuesday, a day after state regulators approved the final permit for the $2.6 billion project amid legal challenges from local activist and Indigenous groups.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-enbridge-starts-construction-line-3-minnesota/

The Associated Press

Minnesota gives final green light to disputed oil pipeline

MINNEAPOLIS (AP) — Minnesota regulators approved the final permit Monday for Enbridge Energy’s Line 3 crude oil pipeline replacement across northern Minnesota, giving the company the green light to begin construction on the $2.6 billion project.

The Minnesota Pollution Control Agency granted a construction storm water permit for the project, which was the last hurdle that Calgary, Alberta-based Enbridge needed to clear after years of reviews and court battles.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-minnesota-final-green-light-disputed-oil-pipeline/

The Associated Press

Minnesota tribes file to halt pipeline approval due to virus

ST. PAUL, Minn (AP) — Two Native American tribes in northern Minnesota are asking state regulators to stop the imminent construction of Enbridge Energy’s Line 3 crude oil pipeline replacement, saying it would increase the risk of coronavirus infections spreading.

The Red Lake and White Earth Bands of Chippewa filed a motion late Wednesday asking the Minnesota Public Utilities Commission to stay its approval of the $2.6 billion project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/ap-minnesota-tribes-pipeline-approval-virus/

The Associated Press

Enbridge sues Michigan over Line 5 shutdown order

By Kelly House, Bridge Michigan, through the Institute for Nonprofit News network

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/enbridge-sues-michigan-over-line-5-shutdown-order/

Bridge Michigan

Army Corps of Engineers grants final federal Line 3 permit

MINNEAPOLIS (AP) — The U.S. Army Corps of Engineers on Monday approved the final federal permit for Enbridge Energy’s planned Line 3 crude oil pipeline replacement across northern Minnesota, bringing the project a step closer to construction.

In a release from its St.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/ap-army-corps-engineers-final-federal-line-3-permit/

The Associated Press

Legal Translation: Environmental attorney explains the latest on Enbridge Line 5 news

With so many twists and turns in the Line 5 story, it’s hard to keep up with the legal filings and positions from Enbridge Energy Corp., various Michigan governmental agencies and groups trying to stop or keep the pipeline.

But in the following conversation, attorney Nick Schroeck, who is the director of the environmental law clinic at University of Detroit Mercy, and Great Lakes Now Program Director Sandra Svoboda have this update about the latest legal actions and a refresher about what the pipeline is all about.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/legal-translation-environmental-attorney-explains-latest-enbridge-line-5/

GLN Editor

Q&A: What Michigan’s move to shut down Enbridge Line 5 means

By Kelly House, Bridge Michigan, through the Institute for Nonprofit News network

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/michigan-shut-down-enbridge-line-5-means/

Bridge Michigan

Michigan governor seeks shutdown of Great Lakes oil pipeline

TRAVERSE CITY, Mich. (AP) — Michigan Gov. Gretchen Whitmer took legal action Friday to shut down a pipeline that carries oil beneath a channel that links two of the Great Lakes.

Whitmer’s office notified the Canadian company that it was revoking an easement granted in 1953 to extend a roughly 4-mile (6.4-kilometer) section of the pipeline through the Straits of Mackinac.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/ap-michigan-governor-seeks-shutdown-line-5-great-lakes-oil-pipeline/

The Associated Press

Judge: Michigan agency can evaluate Great Lakes tunnel plan

TRAVERSE CITY, Mich. (AP) — The Michigan Public Service Commission has some authority over Enbridge’s plans to build an oil pipeline tunnel beneath the channel that connects two of the Great Lakes, a state administrative law judge ruled Friday.

The agency can evaluate the need for the project and whether it would be designed, constructed and operated safely, Judge Dennis W.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/10/ap-judge-michigan-line-5-tunnel-plan/

The Associated Press

New House bills would make anchor strikes in the Straits of Mackinac a felony

By Will Callan, Michigan Radio

The Great Lakes News Collaborative includes Bridge Michigan; Circle of Blue; Great Lakes Now at Detroit Public Television; and Michigan Radio, Michigan’s NPR News Leader; who work together to bring audiences news and information about the impact of climate change, pollution, and aging infrastructure on the Great Lakes and drinking water.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/10/house-bills-anchor-strikes-straits-of-mackinac-felony/

Michigan Radio

Ancient stone patterns in Straits of Mackinac add new wrinkle to Line 5 pipeline debate

MACKINAW CITY, Mich. (AP) — Images from an underwater vehicle seem to reveal stone patterns on the bottom of the Straits of Mackinac in northern Michigan, possible evidence of Native American artifacts from thousands of years ago, a newspaper reported.

A group of amateur explorers raised money to look at Enbridge Inc.’s oil pipeline on the lake bottom.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/10/ap-ancient-stone-patterns-straits-mackinac-line-5-pipeline/

The Associated Press

Opposition team criticizes Enbridge plans for oil tunnel

TRAVERSE CITY, Mich. (AP) — Enbridge’s plans for drilling an oil pipeline tunnel beneath a channel linking two of the Great Lakes do not meet industry standards and pose significant hazards to workers and the environment, experts who reviewed project documents on behalf of opposition groups told The Associated Press.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/ap-opposition-criticizes-enbridge-plans-line-5-tunnel/

The Associated Press

Enbridge now inspects freighters to avoid another anchor strike on Line 5

By Lester Graham, Michigan Radio

The Canadian pipeline company Enbridge Energy has been eager to show news media its new Enbridge Straits Maritime Operations Center in Mackinaw City. Its purpose is to try to prevent another anchor strike or other damage to Line 5, the dual pipelines carrying oil and natural gas liquids.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/enbridge-inspects-freighters-anchor-strike-line-5/

Michigan Radio

Great Lakes Energy News Roundup: Wisconsin utility shutoffs postponed, Lake Erie wind farm, Minnesota mine legal win

Keep up with energy-related developments in the Great Lakes area with Great Lakes Now’s biweekly headline roundup.

In this edition: Wisconsin Public Service Commission extends utility shutoff moratorium, ruling that could undo Lake Erie wind farm project stands, and PolyMet copper-nickel mine gets critical legal win in Minnesota.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/great-lakes-energy-mining-utility-line-5-lake-erie/

Ian Wendrow

Judge OKs oil flow through second Great Lakes pipeline

TRAVERSE CITY, Mich. (AP) — Enbridge said Wednesday it will fully resume operation of a Michigan Great Lakes oil pipeline after a partial shutdown this summer because of damage to a support structure.

Circuit Judge James Jamo signed an order allowing the Canadian company to restore the flow through one of its Line 5 pipes beneath the Straits of Mackinac, which connects Lake Huron and Lake Michigan.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/ap-judge-line-5-great-lakes-pipeline/

The Associated Press

Enbridge just wants a permit. Michigan critics want to bring down Line 5

By Kelly House, Bridge, through the Institute for Nonprofit News network

Enbridge Energy had already won the blessing from Michigan’s Republican Legislature to build a tunnel beneath the Straits of Mackinac to keep oil flowing through Line 5, and survived a legal challenge that sought to unravel that plan.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/enbridge-line-5-permit-michigan-critics/

Bridge

Turtle Recovery: Studying turtles on the Kalamazoo River 10 years after Enbridge oil spill

Josh Otten reached down and pulled two turtles from the bow compartment of his kayak. One was the size of a dinner plate; the other was barely the size of a silver dollar pancake. Both were northern map turtles, the most common species of turtle in the Kalamazoo River watershed, according to Otten who played a key role in the rescue and rehabilitation of more than 2,000 turtles in 2010 following the Kalamazoo River oil spill.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/turtle-recovery-kalamazoo-river-enbridge-oil-spill/

Kathy Johnson

Pipeline tunnel supporters, foes clash before Michigan panel

TRAVERSE CITY, Mich. (AP) — Keeping a 64-year-old oil pipeline in operation by running one portion through a proposed Great Lakes tunnel would safeguard the economy and energy supplies, supporters said Monday, while opponents described the project as an unnecessary risk that would contribute to global warming.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/08/ap-pipeline-tunnel-supporters-foes-clash-michigan-panel/

The Associated Press

Walz administration keeps up fight against Line 3

MINNEAPOLIS (AP) — Gov. Tim Walz’s administration said Tuesday it will appeal the latest approvals by state utility regulators for Enbridge Energy’s plan to replace its old and corroding Line 3 crude oil pipeline across northern Minnesota.

The state Commerce Department faced a Wednesday deadline to ask the Minnesota Court of Appeals to take another look at the project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/08/ap-walz-administration-minnesota-line-3/

The Associated Press

Great Lakes Energy News Roundup: Back Forty mine setback, Illinois and Ohio utility shutoffs

Keep up with energy-related developments in the Great Lakes area with Great Lakes Now’s biweekly headline roundup.

In this edition: Controversial open-pit sulfide mine in UP faces major delays due to COVID-19, utility companies in Ohio and Illinois set to resume disconnections after pandemic-induced moratorium lapses, and Enbridge completes replacement work on Line 5 under St.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/08/great-lakes-energy-back-forty-mine-illinois-ohio-utility-shutoff/

Ian Wendrow

Enbridge contractor vessels may have bumped pipeline support

TRAVERSE CITY, Mich. (AP) — Recent damage that prompted the temporary shutdown of an Enbridge oil pipeline in a channel linking two of the Great Lakes may have been done by vessels working for the company, according to an in-house report provided Thursday to The Associated Press.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/07/ap-enbridge-contractor-vessels-line-5-pipeline-support/

The Associated Press

Whitmer: Enbridge dodging responsibility for potential Line 5 spill

TRAVERSE CITY, Mich. (AP) — Michigan Gov. Gretchen Whitmer criticized Enbridge Inc. on Wednesday for what she described as the company’s refusal to make an airtight pledge to pay for damages caused by a potential oil spill from its pipeline beneath a Great Lakes channel.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/07/ap-whitmer-enbridge-dodging-responsibility-line-5-oil-spill/

The Associated Press

Michigan wants Enbridge to pledge funds in case of oil spill

TRAVERSE CITY, Mich. (AP) — Michigan sought a written pledge Friday from Enbridge Inc. to cover costs that would arise if oil were to leak from its dual pipelines that extend across a channel linking two of the Great Lakes, although the Canadian pipeline company said it had already made such a promise.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/07/ap-michigan-enbridge-line-5-pledge-funds-oil-spill/

The Associated Press

Michigan judge allows restart of disputed Line 5 oil pipeline

By John Flesher, AP Environmental Writer

TRAVERSE CITY, Mich. (AP) — A Michigan judge Wednesday allowed Enbridge to resume pumping oil through a Midwestern pipeline, nearly a week after shutting it down because of damage to a structure that anchors a section of the line running through a Great Lakes channel.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/07/ap-michigan-judge-restart-line-5-oil-pipeline/

The Associated Press

Judge shuts down energy pipeline in Michigan’s Great Lakes

DETROIT (AP) — A judge shut down an energy pipeline in Michigan’s Great Lakes on Thursday, granting a request from the state after the owner reported problems with a support piece far below the surface.

Enbridge Inc. has not provided enough information to Michigan officials to show that continued operation of the west leg of the Line 5 twin pipeline is safe, Ingham County Judge James Jamo said.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/06/ap-judge-shuts-down-energy-pipeline-michigan-great-lakes/

The Associated Press

Michigan asks judge to shut Enbridge pipeline in Great Lakes

MACKINAW CITY, Mich. (AP) — Michigan’s attorney general on Monday asked a judge to shut down a pipeline in the Great Lakes after an energy company discovered that an anchor support had shifted deep below the surface.

Enbridge Inc. insists the Line 5 pipeline itself was not damaged, and the company resumed the flow of oil and natural gas liquids in the west leg of the twin system Saturday.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/06/ap-michigan-judge-shut-enbridge-pipeline/

The Associated Press

Whitmer demands answers from Enbridge on pipeline damage

Michigan Gov. Gretchen Whitmer demanded Friday that Enbridge Energy provide proof that the damage to one of its dual oil pipelines under the Straits of Mackinac will not pose a threat to the area.

The Alberta, Canada-based company closed its Line 5 pipeline under the straits on Thursday after discovering that the anchor support had shifted from its original position, company spokesman Ryan Duffy said Friday in a statement.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/06/ap-michigan-whitmer-enbridge-pipeline-damage/

The Associated Press

Court: Michigan Great Lakes tunnel deal constitutional

TRAVERSE CITY, Mich. (AP) — The Michigan Court of Appeals ruled Thursday that legislators did not violate the state constitution by allowing construction of an oil pipeline tunnel beneath a channel linking two of the Great Lakes, clearing the way for the project to proceed unless another court intervenes.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/06/ap-court-michigan-great-lakes-tunnel-enbridge-line-5/

The Associated Press

Pollution, Permits: Enbridge, Michigan grapple with Line 5 tunnel project

The controversial project to replace the existing 67-year-old Line 5 pipeline in the Straits of Mackinac with a pipeline in a tunnel under the straits remains an issue between Enbridge Energy and the state of Michigan.

A new point of contention in the project is a new permit that would allow Enbridge to withdraw water from the Great Lakes and discharge wastewater.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/pollution-permits-enbridge-michigan-line-5-tunnel-project/

Gary Wilson

Army Corps to hear from public on Enbridge pipeline plan

TRAVERSE CITY, Mich. (AP) — The U.S. Army Corps of Engineers is preparing to hear from the public on Enbridge’s proposal to build an oil pipeline tunnel beneath Michigan’s Straits of Mackinac after determining the company submitted a complete application.

The Corps’ Detroit district office has scheduled a public comment period on the plan.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/ap-army-corps-public-comment-enbridge-line-5-pipeline/

The Associated Press

What are Joe Biden’s views on two of the most controversial environmental projects in Minnesota?

By Walker Orenstein and Gabe Schneider, MinnPost, through the Institute for Nonprofit News network

In late April, former Vice President Joe Biden’s campaign held a virtual event with Minnesota supporters to promote the Democrat’s plans to address climate change and a clean environment.

But while U.S.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/joe-biden-minnesota-mining-line-3-pipeline/

MinnPost

Permit Pause: Michigan regulatory agency wants more info on Line 5

The state agency that has to green light Enbridge Energy’s controversial pipeline in a tunnel project in the Straits of Mackinac hit the pause button on the process last week when it told the company it needs additional information.

The new pipeline would replace the 67-year-old existing Line 5 that runs through the bottom of the straits.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/permit-michigan-egle-enbridge-line-5/

Gary Wilson

Great Lakes Energy News Roundup: Toxic coal ash, utility company water withdrawal, Line 5

Keep up with energy-related developments in the Great Lakes area with Great Lakes Now’s biweekly headline roundup.

In this edition: Chicagoans furious after smokestack demolition releases dust in Little Village, toxic coal ash to remain on Michigan shorelines indefinitely as coal plants close, Minnesota and Wisconsin natural gas plant opting away from water withdrawal for cooling purposes, Ohio consumer advocate pushing to divert energy efficiency funds to COVID-19 relief payments, and Enbridge’s project to replace part of its Line 5 pipeline under the St.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/04/great-lakes-energy-line-5-coal-ash-demolition-water-withdrawals/

Ian Wendrow

Enbridge seeks permits to build Great Lakes oil tunnel

TRAVERSE CITY, Mich. (AP) — Enbridge Inc. applied Wednesday for state and federal authorization to construct an oil pipeline tunnel beneath the Michigan waterway that connects two of the Great Lakes.

The Canadian company wants to build a roughly 4-mile-long (6.4-kilometer-long) tunnel beneath the Straits of Mackinac.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/04/ap-enbridge-permits-great-lakes-oil-pipeline-tunnel/

The Associated Press

Regulation During COVID-19: Canadian, U.S. agencies lighten monitoring priorities

Oil companies successfully request lighter oversight amid coronavirus pandemic. Farmers support the move.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/04/epa-suspends-enforement-covid-19-coronavirus/

George Elkind

Enbridge to move forward with tunnel permitting amid pandemic, Interlochen Public Radio reports

By Kaye LaFond, Interlochen Public Radio

Enbridge Energy will not delay submitting permits for its controversial Great Lakes Tunnel Project because of the COVID-19 pandemic.

Tribal governments that oppose the project want Gov. Gretchen Whitmer to slow the process down. They say it’s impossible to prepare for public comment and official tribal consultations when most tribal staff are sheltering in place.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/04/enbridge-move-forward-tunnel-permitting-covid-19/

GLN Editor

Enbridge hires companies to design, build Great Lakes tunnel

By John Flesher, AP Environmental Writer

TRAVERSE CITY, Mich. (AP) — Enbridge Inc. said Friday it has hired companies to design and build a disputed oil pipeline tunnel beneath the channel linking Lakes Huron and Michigan, despite pending legal challenges.

The Canadian company is forging ahead with plans to begin construction work next year on the tunnel, which would replace twin pipes that have lain across the bottom of the Straits of Mackinac in northern Michigan since 1953.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/03/ap-enbridge-hires-contractors-design-build-great-lakes-tunnel/

The Associated Press