The Catch: The Latest on Enbridge Line 3

Broadcasting in our monthly PBS television program, The Catch is a Great Lakes Now series that brings you more news about the lakes you love. Go beyond the headlines with reporters from around the region who cover the lakes and drinking water issues. Find all the work HERE.

This month, The Catch features a story about Enbridge Energy.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2022/12/the-catch-latest-on-enbridge-line-3/

GLN Editor

Enbridge will pay $11M fine for Minnesota water violations

By Andy BalaskovitzEnergy News Network

This story was first published on the Energy News Network and was republished here with permission.

PIPELINES: Enbridge will pay more than $11 million to settle water quality violations and three aquifer breaches related to Line 3 construction in northern Minnesota; Attorney General Keith Ellison also announced a misdemeanor criminal charge for the company’s alleged taking of water without a permit. 

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2022/10/enbridge-will-pay-11m-fine-for-minnesota-water-violations/

Energy News Network

Enbridge: Line 3 replacement complete; oil will flow Friday

MINNEAPOLIS (AP) — Enbridge announced Wednesday that construction on the upgrade of its Line 3 crude oil pipeline across Minnesota is “substantially complete” and that the company will start filling it with oil later this week.

The Canadian-based company’s president and CEO, Al Monaco, said in a statement that the pipeline “will soon deliver the low-cost and reliable energy that people depend on every day.”

The project was completed despite stiff opposition from tribes, environmentalists and others who argued that the 1,097 mile (1,765-kilometer) pipeline — including the 337-mile (542-kilometer) segment across Minnesota — would violate treaty rights, worsen climate change and risk spills in waters where Native Americans harvest wild rice.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/09/ap-enbridge-line-3-replacement-complete/

The Associated Press

Enbridge ordered to pay $3M for Line 3 groundwater leak

ST. PAUL, Minn. (AP) — Minnesota regulators have ordered Enbridge to pay more than $3 million for allegedly violating state environmental law by piercing a groundwater aquifer during construction of the Line 3 oil pipeline.

The state Department of Natural Resources said Enbridge, while working near Clearbrook in January, dug too deeply into the ground and pierced an artesian aquifer, which resulted in a 24 million gallon groundwater leak.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/09/ap-enbridge-pay-line-3-groundwater-leak/

The Associated Press

Congresswomen urge Biden to stop pipeline in Minnesota visit

MINNEAPOLIS (AP) — Minnesota U.S. Rep. Ilhan Omar and her progressive congressional allies urged President Joe Biden on Friday to stop construction on Enbridge Energy’s Line 3 replacement, even as the project nears completion and the options to stop it dwindle.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/09/ap-congresswomen-biden-stop-pipeline-minnesota/

The Associated Press

Line 3 opponents descend on Minnesota Capitol to seek a stop

ST. PAUL, Minn. (AP) — Protesters descended upon the Minnesota State Capitol on Wednesday to rally against Enbridge Energy’s Line 3 oil pipeline as the project nears completion.

The rally, part of a series of events called Treaties over Tar Sands organized by Indigenous and environmental activists, called on Gov.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/08/ap-line-3-opponents-minnesota-capitol/

The Associated Press

Minnesota Supreme Court delivers blow to Line 3 opponents

Without comment, the state’s highest court declined to take the case, issuing a one-page order that effectively affirmed a decision in June by the Minnesota Court of Appeals. 

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/08/ap-minnesota-supreme-court-line-3-opponents/

The Associated Press

Minnesota court affirms approval of Line 3 oil pipeline

ST. PAUL, Minn. (AP) — The Minnesota Court of Appeals on Monday affirmed state regulators’ key approvals of Enbridge Energy’s Line 3 oil pipeline replacement project, in a dispute that drew over 1,000 protesters to northern Minnesota last week.

A three-judge panel ruled 2-1 that the state’s independent Public Utilities Commission correctly granted Enbridge the certificate of need and route permit that the Canadian-based company needed to begin construction on the 337-mile (542-kilometer) Minnesota segment of a larger project to replace a 1960s-era crude oil pipeline that has deteriorated and can run at only half capacity.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/06/ap-minnesota-court-approves-line-3-oil-pipeline/

The Associated Press

Fight over Canadian oil rages on after pipeline’s demise

BILLINGS, Mont. (AP) — The Keystone XL is dead after a 12-year attempt to build the oil pipeline, yet the fight over Canadian crude rages on as emboldened environmentalists target other projects and pressure President Joe Biden to intervene — all while oil imports from the north keep rising.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/06/ap-fight-canadian-oil-pipelines/

The Associated Press

EXPLAINER: Why a rural pipeline is a climate battleground

As Enbridge Energy prepares to finish rebuilding an oil pipeline across rural northern Minnesota, protesters are occupying part of the construction area and pledging a “summer of resistance” on the ground and in court.

Enbridge, which has obtained all necessary state and federal permits for the Line 3 project, says it will be finished by year’s end.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/06/ap-explainer-line-3-pipeline-climate/

The Associated Press

Need for disputed pipeline argued in Minnesota appeals court

MINNEAPOLIS (AP) — The Minnesota Court of Appeals on Tuesday heard arguments over Enbridge Energy’s Line 3 replacement project in northern Minnesota, which opponents are calling unnecessary due to an eventual decline in the demand for oil.

The Minnesota Department of Commerce, along with the Red Lake Band of Chippewa, the White Earth Band of Ojibwe, and several Indigenous and environmental groups, argued before the three-judge panel that Enbridge failed to show long-term need for the Line 3 project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/03/ap-need-for-line-3-pipeline-argued-minnesota-appeals-court/

The Associated Press

Enbridge Line 3 divides Indigenous lands, people

CLOQUET, Minn. (AP) — Jason Goward was overjoyed to get a high-paying job on Enbridge’s Line 3 pipeline project.

The job, clearing ground with a contractor for the Canadian energy company, meant he could at last pay child support for his two young sons.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/02/ap-enbridge-line-3-divides-indigenous-lands-people/

The Associated Press

Judge blocks another bid to shut down Line 3 construction

MINNEAPOLIS (AP) — A federal judge has rejected another attempt by opponents to shut down construction work on Enbridge Energy’s replacement for its aging Line 3 crude oil pipeline across northern Minnesota.

In an order filed Sunday, U.S. District Judge Colleen Kollar-Kotelly said tribal and environmental groups that filed for an injunction in late December to suspend construction failed to prove any permanent harm would result from allowing the work to proceed or that they’re likely to win on their broader legal arguments.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2021/02/ap-judge-blocks-shut-down-line-3-construction/

The Associated Press

Minnesota regulators deny request to delay Line 3 pipeline

MINNEAPOLIS (AP) — A Minnesota regulatory panel on Friday denied a request from two tribes to prevent Enbridge Energy from moving forward with its contentious Line 3 crude oil pipeline replacement, which broke ground this week after receiving its final state permit.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-minnesota-regulators-deny-request-to-delay-line-3-pipeline/

The Associated Press

What’s next for the Enbridge Line 3 project in Minnesota? Construction. And protests.

By Walker Orenstein, MinnPost, through the Institute for Nonprofit News network

Enbridge Energy has all the permits it needs to start construction on a controversial new crude oil pipeline in Minnesota, more than five years after the Canadian company first asked state regulators to approve the Line 3 project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/enbridge-line-3-project-minnesota-construction-protests/

MinnPost

Enbridge starts construction on Line 3 in Minnesota

MINNEAPOLIS (AP) — Enbridge Energy began construction on its Line 3 crude oil pipeline replacement in Minnesota on Tuesday, a day after state regulators approved the final permit for the $2.6 billion project amid legal challenges from local activist and Indigenous groups.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-enbridge-starts-construction-line-3-minnesota/

The Associated Press

Minnesota gives final green light to disputed oil pipeline

MINNEAPOLIS (AP) — Minnesota regulators approved the final permit Monday for Enbridge Energy’s Line 3 crude oil pipeline replacement across northern Minnesota, giving the company the green light to begin construction on the $2.6 billion project.

The Minnesota Pollution Control Agency granted a construction storm water permit for the project, which was the last hurdle that Calgary, Alberta-based Enbridge needed to clear after years of reviews and court battles.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/12/ap-minnesota-final-green-light-disputed-oil-pipeline/

The Associated Press

Army Corps of Engineers grants final federal Line 3 permit

MINNEAPOLIS (AP) — The U.S. Army Corps of Engineers on Monday approved the final federal permit for Enbridge Energy’s planned Line 3 crude oil pipeline replacement across northern Minnesota, bringing the project a step closer to construction.

In a release from its St.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/ap-army-corps-engineers-final-federal-line-3-permit/

The Associated Press

Drinking Water News Roundup: Wisconsin sets caps for 22 contaminants, lead pipes more likely in POC communities

From lead pipes to PFAS, drinking water contamination is a major issue plaguing cities and towns all around the Great Lakes. Cleaning up contaminants and providing safe water to everyone is an ongoing public health struggle.

Keep up with drinking water-related developments in the Great Lakes area.

Click on the headline to read the full story:

Illinois:

  • People of Color in Illinois More Likely to Live in Communities with Lead Pipes – WBEZ.org Chicago NPR

Research has long shown that pollution often disproportionately affects low income — especially Black and brown — communities.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/11/drinking-water-wisconsin-contaminants-lead-pipes/

Grace Dempsey

Great Lakes Energy News Roundup: Wisconsin utility shutoffs postponed, Lake Erie wind farm, Minnesota mine legal win

Keep up with energy-related developments in the Great Lakes area with Great Lakes Now’s biweekly headline roundup.

In this edition: Wisconsin Public Service Commission extends utility shutoff moratorium, ruling that could undo Lake Erie wind farm project stands, and PolyMet copper-nickel mine gets critical legal win in Minnesota.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/09/great-lakes-energy-mining-utility-line-5-lake-erie/

Ian Wendrow

Walz administration keeps up fight against Line 3

MINNEAPOLIS (AP) — Gov. Tim Walz’s administration said Tuesday it will appeal the latest approvals by state utility regulators for Enbridge Energy’s plan to replace its old and corroding Line 3 crude oil pipeline across northern Minnesota.

The state Commerce Department faced a Wednesday deadline to ask the Minnesota Court of Appeals to take another look at the project.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/08/ap-walz-administration-minnesota-line-3/

The Associated Press

Great Lakes Energy News Roundup: Hydrogen-from-nuclear plants, coal tar and diesel fuel barge beached, Line 3 in Minnesota

Keep up with energy-related developments in the Great Lakes area with Great Lakes Now’s biweekly headline roundup.

In this edition: Federal grant launches pilot program for nuclear plants to produce hydrogen for fuel cells; Canadian barge loaded with fuel, coal tar runs aground near where Lake Superior meets Soo Locks and Lake Huron; Minnesota regulators approve new contested case hearing over Enbridge Line 3 permit, delaying project; and First Nations and university educators in Ontario demand halt to further mining exploration during pandemic.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/06/great-lakes-energy-line-3-indigenous-mining-nuclear/

Ian Wendrow

What are Joe Biden’s views on two of the most controversial environmental projects in Minnesota?

By Walker Orenstein and Gabe Schneider, MinnPost, through the Institute for Nonprofit News network

In late April, former Vice President Joe Biden’s campaign held a virtual event with Minnesota supporters to promote the Democrat’s plans to address climate change and a clean environment.

But while U.S.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/joe-biden-minnesota-mining-line-3-pipeline/

MinnPost