A brownout at a pumping station on Detroit’s east side during heavy July rainfall “played a large role” in basement backups reported upstream, a consultant investigation into the summer flooding concluded in a presentation to the Great Lakes Water Authority board this week. Read the full story by The Detroit News.
Great Lakes Commission
https://www.glc.org/dailynews/20211029-power-issues