Pollution, Permits: Enbridge, Michigan grapple with Line 5 tunnel project

Pollution, Permits: Enbridge, Michigan grapple with Line 5 tunnel project

The controversial project to replace the existing 67-year-old Line 5 pipeline in the Straits of Mackinac with a pipeline in a tunnel under the straits remains an issue between Enbridge Energy and the state of Michigan.

A new point of contention in the project is a new permit that would allow Enbridge to withdraw water from the Great Lakes and discharge wastewater.

Read Now at Great Lakes Now.

Original Article

Great Lakes Now

Great Lakes Now

https://www.greatlakesnow.org/2020/05/pollution-permits-enbridge-michigan-line-5-tunnel-project/

Gary Wilson