A Michigan judge Wednesday allowed Enbridge to resume pumping oil through the Line 5 pipeline in the Great Lakes. The pipeline was shut down for nearly a week after Enbridge reported damage to a structure anchoring the pipeline along the bottom of the lake. Read the full story by Great Lakes Now.
Great Lakes Commission
https://www.glc.org/dailynews/20200706-line-5