Replacement work on a section of Line 5 running under the St. Clair River through Marysville, Michigan has been completed. Read the full story by the Port Huron Times Herald.
Great Lakes Commission
https://www.glc.org/dailynews/20200806-enbridge
Replacement work on a section of Line 5 running under the St. Clair River through Marysville, Michigan has been completed. Read the full story by the Port Huron Times Herald.
Great Lakes Commission
https://www.glc.org/dailynews/20200806-enbridge